Hi Expert,
We have the situation where for the last year we have maintained eight months data in 2011 infotype and the other logic was to pass the left over working days entry from 2012 but due to some issue or to match leaves quota, number of working days in infotype 2012 was maintained more.
For example in infotype 2011 there are already some 230 days working days and from infotype 2012, consultant have passed in another 200 days
working days. So the total number of working days become 430 days.
For this year system is calculating 10 to 15 days extra leaves above the specified quota. PL quota is been calculated based on number
of working days.
My assumption is the extra number working days are been carried forward to this year and system is adding old left over working days
number with the number of working days maintained in infotype 2011 and giving wrong figure.
The PCR is written in such a way that PL will be credited only at the end of the year till then PL quota will not be calculated only it will get actuated.
If my assumption is right then how to control this the last year carry forward.
Please suggest.
Regards
Alok