Hi All
In positive time management, we have a break concept as reorded below in 2011 IT.
Planned working time 8 to 16:30. And Break time 12 to 12:30.
05.12.2013 08:00:00 P10 Clock-in
05.12.2013 12:00:00 P15 Start of break
05.12.2013 12:30:00 P25 End of break
05.12.2013 16:30:00 P20 Clock-out
after running PT60 time evaluation
Table TIP
From To 1 P ID CT P TTyp BR ER C O I BPin EPin PT ALP C1 AB Number
08.0000 12.0000 1 00 P10 P15 E 0005 4.0000
12.0000 12.5000 0 00 P15 P25 E 0006 0.5000
12.5000 16.5000 1 00 P25 P20 E 0007 4.0000
Table TZP
Time Time ID Paid break period Unpaid break period
00.0000 01 0.0000 0.0000
08.0000 02 0.0000 0.0000
12.0000 05 0.5000 0.0000
12.5000 02 0.0000 0.0000
16.5000 01 0.0000 0.0000
I want to query the total number of hours employee has worked on the particular day, need help.
Regards
Sai