HI We went live with negative time Mgmt in March 1st 2013.In Feb 2014 we recieved a request to chnage the base entitlements effective from Dec 15th 2013. So that the chages are effective from DEc 15th 2013 we ran the time eavluationn with forced calculation date as Dec 15th 2013.With these chnages done we are getting correct Quota being generated in it 2006.
But the duration of the time evaluation in back ground mode has increased from one hr to 15 hrs .
I have a question here do we need to always run the time evaluation with forced run date filled in or the forced run is a one time activity and once the quoat have been genertaed we can remove the forced run option and run the time eavluation as usual.
Can some body help me answer this question .
Thanks and regards
Rajeev Chhabra