Changing time evaluation period

$
0
0

Hi masters,

 

I´m following this post: http://scn.sap.com/message/14195529

 

to change my time evaluation period from 26th to 25th next month.

 

time schema is ok, the balances are calculate ok, but in pt_Bal00, it´s showing the balances from previous month.

 

My employee is active from 1st of March but time evaluation is calculated from 1st of April (to 25th of the same month)

 

greenshot_2013-10-07_18-52-59.jpg

 

I re-generate RPTIME00, SAPFP51T, RPTEDT00 and RPTBAL00, but for example if I havea balance ofdelaycalculatedfor day4 andApril 5, andthe report pt_bal00is showingmeforthe7 toMarch 8.

 

2.jpg


I deletedthe clusterB2,recalculatedtimes andrelaunchedthept_bal00and the same.

 

internally, I see that 1st of April, in ZES is 7th day (logically, because first day of time evaluation is 26th of March)

 

Any idea? thanks a lot.