Hi All,
Document on generation of absence quote without running Time Evaluation.
Hope this helps someone further.
Generating Quota without Time Evaluation. (Updating IT2006 with running rptqta00)
Step:1 Create Absence Quota
Step:2 Determine Entry Screen and Time constraints
Step:3 Define Absence Quota Type
Step: 4 Permit Quota generation without time evaluation
Step: 5 Base Entitlement
Step: 6 Determine Validity and Deduction Period
- Step: 8 SM30 : Table V_T559LàValidity Period for Default Values
Step: 9 Selection Rule
Step: 10 Define Deduction Rules for Absence and Attendance Quota
Step: 11 Define Counting Rules
Step: 12 Assign Counting rule to absence
Step: 13 Maintain IT2006 in Infogroup
Output: Run PA40 hiring Action –where it will dynamically trigger IT2006 and update automatically.
Three Steps to be maintained to update IT2006 without time evaluation
- Permit quota generation should be selected as no generation .
- Validity period for default values.
- Maintain IT 2006 in Infogroup.
Regards
Pari